ADVERTISEMENT
Comments

It looks an old train, and research found it was built 1928 - Preserved British Steam Locomotives 5526 was built at Swindon Works in May 1928 and cost the princely sum of £3,602 which included £737 for the boiler. It was first based at St.Blazey Shed, and it was during this period that it was out-based at Bodmin for two months for the working of the branch to Weybridge. Good capture, and processing, Alan.
Ian
Ian